TRM's Nuclear Power Plant Applications
Boilers
Temperatures:
-
Main water feed
-
Emergency cooling water
-
Pressure vessel cooling water
-
Main steam header
-
Performance rake – main steam
-
Hot reheat header
-
Cold reheat header
-
Weld leakage monitors (collars)
-
Primary header - main steam
-
Secondary header - main steam
-
Concrete surrounding outlet headers
-
Steam valve metal and steam/valve passing
-
Dump steam
-
Start-up vessel
-
De-aerator
-
Steam trap passing
Heat Source
Temperatures:
-
Concrete
-
Recirculating gas
-
Liner Vessel penetration
Strain:
-
ERTs/vibrating Wire Strain Gauges (VWSG)
Turbine
Temperatures:
-
Boiler feed pumps
-
Cooling water
-
Bearing
Vibration:
-
Bearing – magnetic monitors on pumps
Outage work
Preventative:
-
Removal and/or protection of instrumentation prior to any grinding/NDT/welding/mechanical works
-
Subsequent replacement/repair and/or check
Test/repair:
-
Loop resistance/IR/polarity and tightness check via check sheets – subsequent repair/recovery of IR
-
Long term monitoring of health of instrumentation via check sheet analysis
Other instrumentation:
-
LVDT installation/calibration – boiler movement – crack monitoring
-
Calibration/installation of CJC reference units
-
ERTs – specialised RTD enabling use as temperature and/or strain measurement (VWSG)
-
Strain measurement
|