Print E-mail
TRM's Nuclear Power Plant Applications

Boilers

Temperatures:

  • Main water feed
  • Emergency cooling water
  • Pressure vessel cooling water
  • Main steam header
  • Performance rake – main steam
  • Hot reheat header
  • Cold reheat header
  • Weld leakage monitors (collars)
  • Primary header - main steam
  • Secondary header - main steam
  • Concrete surrounding outlet headers
  • Steam valve metal and steam/valve passing
  • Dump steam
  • Start-up vessel
  • De-aerator
  • Steam trap passing

Heat Source

Temperatures:

  • Concrete
  • Recirculating gas
  • Liner Vessel penetration

Strain:

  • ERTs/vibrating Wire Strain Gauges (VWSG)

Turbine

Temperatures:

  • Boiler feed pumps
  • Cooling water
  • Bearing

Vibration:

  • Bearing – magnetic monitors on pumps

Outage work

Preventative:

  • Removal and/or protection of instrumentation prior to any grinding/NDT/welding/mechanical works
  • Subsequent replacement/repair and/or check

Test/repair:

  • Loop resistance/IR/polarity and tightness check via check sheets – subsequent repair/recovery of IR
  • Long term monitoring of health of instrumentation via check sheet analysis

Other instrumentation:

  • LVDT installation/calibration – boiler movement – crack monitoring
  • Calibration/installation of CJC reference units
  • ERTs – specialised RTD enabling use as temperature and/or strain measurement (VWSG)
  • Strain measurement

 

If you don’t quickly find what you’re looking for on our website please get in touch with us, click here to send us a message.